Farm based Biogas

We have built over 50 farm based digesters, ranging from 0,3 to 2,5 MW

We have built over 50 farm based digesters, ranging from 0,3 to 2,5 MW

Adverio’s project managers and engineers have built over 50 farm based digesters, ranging from 0,3 to 2,5 MW, for Heat and Power, in combination with biogas upgrading, or for fertiliser production in the Netherlands, UK, Ireland and Middle East. The waste problems of the client are eliminated and renewable energy is provide to the national grid and/or own consumption.

Adverio’s and Dabar Engineers have completed 4 single permit applications of 1MW (agriculture) AD’s at Spain and are working to complete several others.

Adverio´s process has clear advantages over conventional systems

Our fermentation process has a shorter throughput time in the digester than conventional systems, so the digester can be smaller dimensioned, requiring lower investment and hence, a shorter ROI. In addition, the AWS process has higher gas yield than conventional systems and is able to ferment high lignin materials such as grass and wood, to enable even quicker ROI.

 

Our deliverables:

  • Design and Engineering
  • Feasibility Studies
  • Biological Testing
  • Permit Application
  • Procurement supervision Construction supervision Operational guidance
  • Start-up

AD farm based case study

In cooperation with:

Please check our references or contact us for more information.